Friday, January 18, 2013

INSIDE WORK

This is the bathroom we are using. Why two toilets? The one on the right is the only one that works.
Martha is getting to use all sorts of tools. She used the sawzaw with a chipping blade to remove the floor tile. What a job!
Eric, a member from the church, worked all last week removing all the tile on the wall and floor in the boys bathroom.. We were so glad he did it and we didn't have to.
Gene and Larry worked on getting the bathroom ready to dry wall.
Martha was introduced to mudding.
A closet was to built in the hallway.
Joan , Martha and I got the area painted.Larry framed out a closet.. Gene and Larry hung the drywall and Gene put the shelves together. 
Handles and knobs were needed  in the kitchen on the cabinet doors.
The kitchen painted green, the ceiling white and a nice new light. A lot of progress has been made this week.